This week I almost finished sealing the left fuel tank. I kinda ran out of steam (energy) today before I got the back baffle installed. I got all the ribs, vent lines, and related details completed but I was tired of breathing Proseal and MEK through a respirator so I called it a day.
 |
Stiffeners riveted and sealed on the left fuel tank. |
 |
Here is the tank almost ready for the back baffle to be dropped in. The fuel level sender still needs to be installed and a few shop heads still need to be encapsulated with sealant before the final baffle install. |