Yep, more wiring. Well, wiring and related tasks. The past few weeks have been a blur of small tasks all related to getting the interior panel area all buttoned up. I expect the engine to be ready in the next month or so which means I will want to get the airplane up on its gear and engine mounted.
This is a rather odd perspective but its under the center console looking aft to where the fuel valve extension comes up through the tunnel (the star shaped object bolted on with 3 washers and one nut. Below that is the bracket that will hold the throttle and prop cable housing. What you can't see even further back is the base of the throttle quadrant. |
Throttle quadrant bolted down to the tunnel cover. There is a sizable doubler on the under side of this sheet that is attached by all those AN470 rivets you see. |
This is what it looks like now. The quadrant is bolted on, the cable mount is bolted on, and the wire loom for the headset jacks is bolted to the tunnel cover. |
Following the footsteps of a couple others who have gone before me I attached the silver relay housing to the SDS CNC'd ECU enclosure. The wiring harness for the two just seemed to be made for this. |
This is the back side of the firewall where the ground penetration goes through. Still lots of wire work to do including some support needs. |
Here the Lemo plugs are installed and ready to be mounted in the center console. |
Most of the wires are installed at this point. Still a few more to terminate like the blue and brown wires you see hanging out. |
This is the final look of those label plates that I engraved on the CNC a few weeks ago. I think they look good! |