| This is the first time the windshield has been on the airplane so I had to take a picture. I was measuring how far forward I had to paint the glare-shield. |
![]() |
| This is the glare-shield painted. Now all I have to do is install the windshield! |
This blog is my ramblings about building and flying my airplanes. Its purpose is to give me some kind of documentation of my build process but in truth its only here so I don't have to keep answering the question...what are you working on now? ;-)
![]() |
| This is the first time the windshield has been on the airplane so I had to take a picture. I was measuring how far forward I had to paint the glare-shield. |
![]() |
| This is the glare-shield painted. Now all I have to do is install the windshield! |
![]() |
| As I mentioned above....we got a little snow this week. 2 full snow days and 2 that were iffy. |
![]() |
| This is the forward side of the door. In those cavities the door pin guides get installed. |
![]() |
| This is the aft side door pin cavities. |
![]() |
| Side view of same door as picture above. |
![]() |
| In this picture you can see the seam between the cabin top and the fuselage. I sanded and then filled the small gap with micro/epoxy filler. |
![]() |
| The door gap came out pretty nice by using some 1/8" rubber gasket material. If I were going to do it again I don't think I would use the same stuff since it was a real bugger to remove. The sticky side was up against the door and the plain rubber side was against the cabin top. Turns out that epoxy loves that plain rubber and stuck like crazy. I had to actually sand the gasket material off of the cabin side. |
![]() |
| Door struts installed and doors in up position! Very cool! |
![]() |
| I used a little thermal paste and a couple of screws to mount the engine bus supply diodes to a heat sink. |
![]() |
| Close up with the door struts installed. |
![]() |
| I got the static system run up to the front of the cabin. |
![]() |
| I riveted these supports (black parts) on both side of the cabin. |
![]() |
| Door's cleco'd to the fuselage so I could drill the holes to hold the door on while the two halves cure...see more below. |
![]() |
| The inner half of the door sanded and ready for wet-out and epoxy mix. |
![]() |
| Fuselage with a layer of plastic as well as some packing tape to keep the doors from sticking to them. |
![]() |
| Lots of squeeze out so hopefully I got a nice amount of coverage. |
![]() |
| On the right side door I managed to take a picture of the epoxy/Cabosil mixture after I had "combed" it with the spreader I mentioned above. |
![]() |
| A look from inside the cockpit through the baggage door after I had cleco'd the right side door on for curing. |
![]() |
| Left side door trimmed to fit into the opening. |
![]() |
| Of course every RV-10 builder has to take a picture of the first time to door opens on its own hinges. Those gull wing doors are just awesome! |
![]() |
| Once the doors were trimmed to fit it was time to start putting the actuation mechanism in place. This is the pocket that the handle sits in. |
![]() |
| Trimming the Delrin guides to fit their pockets. |
![]() |
| Center gear assembly installed and aft actuator rod attached to the rack piece that goes into the center latch. |