Sunday, March 4, 2018

Left fuel tank - almost done

This week I almost finished sealing the left fuel tank.  I kinda ran out of steam (energy) today before I got the back baffle installed.  I got all the ribs, vent lines, and related details completed but I was tired of breathing Proseal and MEK through a respirator so I called it a day.

Stiffeners riveted and sealed on the left fuel tank.
Here is the tank almost ready for the back baffle to be dropped in.  The fuel level sender still needs to be installed and a few shop heads still need to be encapsulated with sealant before the final baffle install.